
November 9, 2026
In a few years, the beach near 'Paal 9' (Marker 9) will become significantly wider. Rijkswaterstaat plans to deposit no less than 2.8 million cubic meters of sand along the southwest coast of Texel. At its widest point near Paal 9, the beach is expected to reach a width of approximately 300 meters. According to the latest schedule, work is set to begin in 2028.
Along the southwest coast of Texel, wind, waves, and currents cause a significant amount of sand to wash away. To protect the coastline, new sand is added on a regular basis. This time, the volume involved is much larger than usual. As a result, Rijkswaterstaat expects that it will not need to replenish the sand again for another four to six years. This also means less disruption to marine life and beach-based recreation.
The beach will not remain as wide as it is immediately after the work is completed. Waves and currents will gradually spread some of the new sand along the coastline. This is intentional: the sand helps prevent further erosion in other areas along the coast.
Would you like to receive our newsletter, packed with tips on Texel, the latest news, and giveaways?